Project News

    The demolition work of the YAMAMA project in Saudi Arabia ha

    發布於2023-11-24 11:31 點擊:
           The demolition work of the cement grinding workshop of the YAMAMA project in Saudi Arabia is the last node of our company's demolition work, and it is also a key and difficult point; The cement grinding workshop is designed to be compact and fully enclosed; All equipment, structures, and non-standard items in the workshop require the use of chain hoists for operation; Especially the overall removal of the large dust collector and cement mill is even more difficult.
           The main time period for the dismantling of cement mills is July, August, September, and October, which is the period when Saudi Arabia has the highest temperature, with a maximum temperature of 48 ℃. Moreover, the cement mill is a closed workshop, and the workshop is particularly hot and difficult to handle; Faced with difficulties, Jingxing people choose to face them and carry forward the spirit of not afraid of hardship and fatigue. With collective thinking and strategies, they have successfully completed the established milestone plan for the demolition of cement mills in a safe and timely manner, while ensuring heatstroke prevention and dust prevention.

     
     
    Contributed by Jin Hailong